Kashmere Gardens

Community Data Metrics

Mobility & Infrastructure

Transportation

Workers Riding Public Transit


Zip Code
--
Houston
- -

AllTransitTM Performance Score


Zip Code
- -
Houston
- -

Average Routes Available for Households


Zip Code
- -
Houston
- -

Average Frequent Routes for Households


Zip Code
- -
Houston
- -

Average Trips Available Per Week for Households


Zip Code
- -
Houston
- -

Transit Stops


Zip Code
- -
Houston
- -

Auto Ownership

Households Without a Car


Zip Code
Houston

Urban Flooding

Percent of land in 100yr FEMA Flood Zone


Zip Code
- -
Houston
- -

National Flood Insurance Program payouts 2010-2020


Zip Code
- -
Houston
- -

311 flood calls 2020


Zip Code
- -
Houston
- -

Resources

School Sidewalk Program

The School Sidewalk program constructs sidewalks up to four blocks leading to an existing school, not including sidewalks around the perimeter of the school.

Visit Website

Pedestrian Accessibility Review Program

The highest priority projects come from the Mayor’s Office for People with Disabilities Pedestrian Accessibility Review. The request provides up to 1,500 feet of improved sidewalk accessibility for people with disabilities to safely travel to the bank, bus stop, educational facility, employment, grocery store, home, medical facility, METROLift, pharmacy, vehicle or place of worship.

Visit Website